Scaled Agile Framework 4.0: What is essential and what is open to conversation, experimentation and adaptation?
ESSENTIALS
1. SAFe Lean-Agile Principles
- Take an economic view
- Apply systems thinking
- Assume variability; preserve options
- Build incrementally with fast, integrated learning cycles
- Base milestones on objective evaluation of working systems
- Visualize and limit WIP, reduce batch sizes, and manage queue lengths
- Apply cadence, synchronize with cross-domain planning
- Unlock the intrinsic motivation of knowledge workers
- Decentralize decision-making
2. Agile Teams / Release Trains / Value Streams
- ART is main building block
- every SAFe starts with launch of ART
3. Lean-Agile Leaders
- Lead the change
- Know the way, emphasize life-long learning
- Develop people
- Inspire and align with mission; minimize constraints
- Decentralize decision-making
4. Vision and Program Backlog
- The “WHAT” and the “WHY”
- Economic priorities
- Single ”access point” to train’s capacity
- Built-in alignment
5. Key Program Events
- PI Planning – all hands on deck
- System Demo – fully integrated increment, every iteration
- Inspect and Adapt – global optimization
6. Critical Roles
- SM and PO
- business owners - accept product
- system architect / engineering - keeps teams from running astray
- RT engineer - ART SM analog
- product manager - ART PO analog
- customer - involved
7. Architectural Runway—existing code, hardware components, etc. that technically enable near-term business features
8. Program Increment - Facilitate reliability, Program Increment readiness, planning, and
innovation - Provide sufficient capacity margin to enable cadence.
- Innovation: Opportunity for innovation spikes, hackathons, and infrastructure improvements
- Planning: Provides for cadence-based planning
- Estimating guard band for cadence-based delivery
9. Cadence - Whole system sprinting, all teams on same metronome w/ all meetings, e.g. 8-12 weeks
ADJUSTABLES
Structural adjustments
- What to organize trains and teams around? (whole of pieces of work: feature, skills needed, component, value subsystems)
- Whether or not to have a System Team?
- Do we need Value Stream Level?
- How to organize DevOps? capability?
- Should UX be at the Team-, Program- or Value Stream level?
- Performance - how team/group works together, how contributes best to overall optimization
Behavioral adjustments
- Duration of PIs?
- What should the System Team do?
- What is the DoD? for Team- vs System Increment?
- How frequently should we release value?
- How long should be our Architectural Runway?
- What capacity allocations do we need and how big?
- What method to use at the team level: Kanban or Scrum or both?
- Who should actually perform the System Demo?
- What decisions should be made by Architect vs Teams, Product Management vs POs, etc?
- How exactly should Customer be involved?